Sample Work Breakdown Structure (Wbs)

591 words - 3 pages

SAMPLE WORK BREAKDOWN STRUCTURES
VARIOUS TYPES OF PROJECT
Page 1
Printed on: January 27, 2010
Applications Development Project Sample WBS
Management and support
Provide project management
Provide quality control
Conduct meetings and reviews
Materials and supplies
Travel and living costs
Miscellaneous costs
Consulting fees and subcontractor costs
Contingency
Systems development
Requirements specifications
Conduct information-gathering sessions
Prepare logical data model
Prepare logical process model
Physical design
Prepare physical data model
Prepare physical process model
Online system
Prepare detailed design
Program and unit test
Document
Batch system
Prepare ...view middle of the document...

s
Planning
Define move strategy
Prepare interim operations plan
Move plan
Conduct facilities inventory
Conduct applications inventory
Prepare move plan
Facilities move
Site preparation
Prepare site plan
Prepare physical site
Provide environmental and electrical facilities
Provide network connectivity
Set up interim facilities
Conduct move
Cleanup
Clean up original site
Remove interim facilities
Applications move
Transfer applications to interim facilities
Load and test applications
Prepare interim documentation
Monitor operations on interim facilities
Transfer applications to final facilities
Load and test applications
Prepare operations documentation
Commence applications and systems management
Operations
Prepare operations procedures and documentation
Conduct operator training
Prepare help desk procedures and documentation
Customer
SAMPLE WORK BREAKDOWN STRUCTURES
VARIOUS TYPES OF PROJECT
Page 4
Printed on: January 27, 2010
Provide contract management
Conduct milestone reviews
Conduct training
Acceptance testing
Prepare acceptance criteria
Conduct acceptance tests
Hand over to customer
SAMPLE WORK BREAKDOWN STRUCTURES
VARIOUS TYPES OF PROJECT
Page 5
Printed on: January 27, 2010
System Upgrade Project Sample WBS
Management
Provide project management
Provide quality control
Conduct meetings and reviews
Materials and supplies
...

Other Papers Like Sample - Work Breakdown Structure (Wbs)

Project Mgt Chap 4 Essay

1962 words - 8 pages Chapter 4 DEFINING THE PROJECT Chapter Outline 1. Step one: Defining the project scope A. Employing a project scope checklist 1. Project objective 2. Deliverables 3. Milestones 4. Technical requirements 5. Limits and exclusions 6. Review with customer 2. Step two: Establishing project priorities 3. Step three: Creating the work breakdown structure A. Major groupings found in a WBS B

It Management Essay

1552 words - 7 pages this process (Monitoring & Controlling Process Group) 4. List and briefly describe five approaches for creating work breakdown structures? Answer: The five approaches to developing the work breakdown structure: Using guidelines The analogy approach The top-down approach The bottom up approach The mind-mapping approach The first approach for develop the WBS is using guidelines. Most of the

Scope Management

814 words - 4 pages deliver a project scope statement. The project scope statement will provides information such as the product description, detail deliverables and acceptance criteria. This step provides a very clear goal and expectation for the team to know exactly what and how is the project is going to be delivered. 4. Creating WBS: Work breakdown structure divides the required work into smaller units based on the complexity of the project. It provides a blueprint

Project Management

2407 words - 10 pages deliverable as completely as possible including: – Requirements – Is/Is Not List – Acceptance/Completion criteria The project deliverables, scope definition, and requirements will become clearer and more specific as time goes on. + Identify the work Create the WBS A work breakdown structure (WBS) is a hierarchy of all work to be accomplished on the project and helps define the project deliverables required to satisfy the project’s

Tools For Pm

1692 words - 7 pages being educated on all the tools at his/her disposal to be better prepared to prevent the project from failing. In order for anything to succeed, it must have a strong foundation and the foundation for project management to succeed the PM should start with a WBS (Work Breakdown Structure). The work breakdown structure is said to be (if not the most important) one of the most important tools a project manager should possess. The WBS provides the

Week 4 Assignment 2

340 words - 2 pages that the project team has given enough though to all the key areas, and is well prepared to execute the project, thus enabling complex tasks to be broken down and managed in an effective manner (Koolbreeze, A., n.d.). From a communication perspective as well, the work breakdown structure looks at the various tasks that are being performed by different stakeholders and organizes the required communication, and also coordinates connected tasks that

A Strategy Paper

1252 words - 6 pages Estimating Project Times and Costs Estimating ESTIMATING PROJECTS Estimating The process of forecasting or approximating the time and cost of completing project deliverables Types of Estimates Top-down (macro) estimates: analogy, group consensus, or mathematical relationships Bottom-up (micro) estimates: estimates of elements of the work breakdown structure WHY ESTIMATING TIME AND COST ARE IMPORTANT Estimates are needed to

The Trophy Case

772 words - 4 pages work breakdown structure(WBS) to show what work need to be completed and who needs to complete it. Since this project had its issues from the start it was evident that the WBS was not thoroughly planned out. There was no communication between the functional managers they worked as separately on the same project. This would create confusion between staff and lead to duplicate work, lack of progress and over all requiring more time for completion

Manchester United Score Club

1222 words - 5 pages ) Glossary 8) Bibliography 1. Work Breakdown Structure WBS is a diagram used to selectively collect information required in all the project life cycle phases, in order to meet the stakeholders requirements and as a performance measure against the organisation strategic plan. The purpose of the WBS is to subdivide the scope of work into a number of manageable packages that re easier to plan, estimate and assign to a responsible party for

Implementing Wireless Network

5379 words - 22 pages management, and the rest of the organization. ( Corporate o Programme Management r T t t t 1 I \T&-%X'W' I ? - P ?A I i .-z-*M"- I *%%-e',Wzrprp " " Planning Figure 2.8: PRINCE Diagram 2.3.3 Work Breakdown Structure (WBS) A project work breakdown structure (WBS) is a deliverable or product-oriented grouping of project work elements shown in graphical display to organize and subdivide the total

Project Management

3572 words - 15 pages team or line manager happens. Or, other team needs help from you. So, allocation of resources, and level your project could cause split tasks and extend the finished date. All situations cause any side of triangle change. 6. Work breakdown structure (WBS): The Work breakdown structure (WBS) oriented with the military. The U.S. Department of Defense created the concept when developing the Polaris missile program in the late 1950s. After

Related Essays

Work Breakdown Structure (Wbs) Essay

858 words - 4 pages WBS for Remodeling the Master Bathroom A work breakdown structure (WBS) “is a view into the project which shows what work the project encompasses” (Piscopo, 2013, para. 1). Whether a project is personal or professional a WBS helps to develop a schedule and define what needs to be done to get the project completed. In the following WBS for a bathroom remodel, there are three levels. The first level defines what the work breakdown structure

Wbs (Work Breakdown Structure) Essay

1264 words - 6 pages Explain the content of a Work Breakdown Structure (WBS) and discuss its role in project management and the connection to the organisation. Work Breakdown Structure (WBS) is a tool that is used to define the work elements of a project and identify its entire scope. It is the map of the project which identifies all elements of the project and allows managers to keep track and control of it. It is made of a hierarchy which facilitates the

Work Breakdown Structure Essay

821 words - 4 pages Work Breakdown Structure (WBS) A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections. The Project Management Body of Knowledge (PMBOK) defines the work breakdown structure as a "deliverable oriented hierarchical decomposition of the work to be executed by the project team." The work breakdown structure visually defines the scope into manageable chunks that a project team can

Work Breakdown Structure Essay

1162 words - 5 pages This has not been written by me but learners working on project management will find this useful. Introduction to the WBS The Work Planning process is divided into three phases, viz. Work Breakdown Structure (WBS) Development, Time and Cost estimation, and Schedule development. The Work Breakdown Structure (WBS) is a hierarchical description of all the work that must be done to meet the needs of the customer. While the three