Cpm And Pert Essay

2966 words - 12 pages

Table of Contents
1.0 INTRODUCTION 3
2.0 NETWORK TECHNIQUES 7
2.1 Introduction 7
2.2 Critical Path Method (CPM) ……………………………………………………………..…………………………………… 8
2.2.1 Steps of CPM Project Planning ……….……………………………………………………………………………… 9
2.2.2 Example of CPM …………………………………………………………………………………………………………… 11
2.2.3 Benefits of CPM …………………………………………………………………………………………………………… 12
2.2.4 Limitation of CPM …………….…………………………………………………………………………………………. 12
2.3 Project Evaluation and Review Techniques (PERT) ……..……………..………………………………………… 13
2.3.1 Steps of PERT in Project Planning ……....……………………………………………………………………….. 14
2.3.2 Benefits of ...view middle of the document...

1.3.2- Technical design:
The phase where the design of the project is made.
1.3.3- Financing:
The phase where the cost of the project is estimated and the method of payment is determined.
1.3.4- Contracting:
The phase where the contractors and the sub-contractors are chosen and the terms of the contract are made.
1.3.5- Implementation:
The phase where the actual construction is started and the project is transformed from papers to the actual work.
1.3.6- Performance monitoring:
The phase where the work that is getting done is being monitored to meet the actual specifications of the project.

1.4 Basic Elements of Project Management:
In order to have a successful project there are four basic elements that needs to be managed, which are: Cost, Resources, Time and Scope. All those elements are interrelated and need to be managed together where the success in managing them will lead to the success of the project it self.

1.5 Project Planning Techniques:
Project planning techniques can be divided into two major methods, which are:
1.5.1- Grantt Chart/ Bar Chart:
This method was used for the first time during the industrial revolution in the late 1800’s where an industrial engineer named Henry Grantt developed that method to improve the factory efficiency.
Nowadays this method is used for scheduling the tasks that needs to be done and in tracking the progress of the project it self.
The technique used in the method is the use of bars to determine each task where the length of each bar shows how long dose the task needs to be done.

Example of the Grantt Chart

1.5.2- Networking Techniques:
This techniques is based on the network idea where the outlook of it looks like a big network of tasks and it’s divided to two methods, which are:
- Critical Path Method.
- Project Evaluation and Review Technique (PERT).

Example of the Critical Path Method Chart

Example of the PERT Chart
This report will be discussing about the Networking Techniques in project management which which are CPM and PERT.

2.0 NETWORK TECHNIQUES:
2.1- Introduction:
Network Techniques is the general name given to certain specific techniques, which can be used for the planning, management and control of projects.
This techniques were devoloped for two different reasons but they were devoloped in the same time during the late1950’s. where the CPM technique was devoloped in the year 1957 by DuPont it was created to manage shutting down a chemical plant for maintenance and then restart it again once the maintenance is done.
As for the PERT method it was devoloped in the year 1958 by Booz, Allen and Hamilton for the U.S. Navy's Polaris project where there were thousands of contractors in that project. This method was devoloped to reduce both time and cost required to finish up this project.

example of PERT

example of CPM

2.2- Critical Path Method (CPM):
as mentioned before this technique was created in the late 1950’s in the...

Other Papers Like Cpm and Pert

Pert Analysis in Management Sceinces

5340 words - 22 pages Results …………………………………………………….. 15 4.4 Recommendations ………………………………………………………... 16 4.5 Conclusions ………………………………………………………………. 16 4.6 Acknowledgement ………………………………………………………... 17 4.7 References ………………………………………………………………... 17 Abstract PERT (Project Evaluation and Review Technique) followed by CPM (Critical Path Method) is a method of

Project Plan Part II Essay

1442 words - 6 pages Evaluation and Review Technique (PERT), Critical Path Method (CPM), and Gantt charts. Developing a PERT chart requires all project activities arranged in a Work Breakdown Structure (WBS) format representing tasks dependencies and appropriate timeframes. The WBS format also helps identify the earliest beginning and ending dates for all tasks pertaining to the project, which are necessary steps in order to highlight the critical path for project

Product Management

5560 words - 23 pages Energy Efficiency 160 7. Project Management Project Planning Techniques The three basic project planning techniques are Gantt chart, CPM and PERT. All monitor progress and costs against resource budgets. Gantt Chart Gantt charts are also called Bar charts. The use of Gantt charts started during the industrial revolution of the late 1800's. An early industrial engineer named Henry Gantt developed these charts to improve factory

Wgu Qat1 Task 4

893 words - 4 pages QAT1 Task 4 Given: Company A is installing a Web-based customer-feedback system to meet customer needs for quick response when rolling out new products. A new product line is rolling out in 34 weeks and the customer-feedback system must be installed and running in time for the new product launch. Table 1.1 in the attached worksheet “PERT/CPM Tables” shows three estimates of the time it will take Company A to complete each of the

Duck Unlimited Keystone Conference: Initial Planning

1063 words - 5 pages (PERT) monitors the activities of the project. PERT is used in conjunction with CPM to ensure that projects are completed in time and cost efficiently. The resources that were removed from eliminated or reduced areas are now available for change of process in more critical areas of the project. This will ensure that each activity is completed accurately before the next activity will begin according to Gray & Larson. Duck Unlimited Keystone Conference: Budget Issues 6 Reference Gray, C., & Larson, E. (2008). BUS 517: Project Management: The Managerial process: 2009 Custom Edition (4th ed.). Boston, MA: McGraw-Hill.

Test

2765 words - 12 pages Booze el, Allen, y el grupo de consultoría de Hamilton, se llama Programa de Evaluación y Revisión Técnica (PERT). En sentido estricto habla el método PERT hace uso de las técnicas de probabilidad, mientras que CPM no lo hace. In other words, with PERT it is possible PERT Diagramas de red es posible calcular la probabilidad de que una actividad se completa con un cierto tiempo, mientras que no es posible con la RPC. Network Diagrams To show the

Finalizing the Addition to the Company

3034 words - 13 pages people involved in the project. PERT has a disadvantage because of timetables, being largely time focused and is expensive which can put a strain on project resources. Critical Path Method (CPM) is used to estimate the smallest amount of project time and to describe how much give and take in scheduling on the logical network paths within the schedule. The CPM is similar in advantages as PERT is in helping in the scheduling, monitoring and

Organisational Study of Polaris

658 words - 3 pages about seven wastes in production and what are the basic elements and benefits of JIT. (Marks 8) Or (b) (i) What are the methods used for accounting the issues of stores and what are the main reasons for accumulation of obsolete, surplus and scrap items how it can be avoided. (Marks 8) (ii) What are the levels of management and MIS and what are the various output reports and limitations of MIS. (Marks 8) 15. (a) (i) Compare PERT and CPM

Production and Operation Management

863 words - 4 pages | |1940-1947 |Operation research, |OR groups | | |Linear programming |George Dantzig | |1960s |Extensive development of quantitative tools (CPM/PERT) | | |1970s |Inventory control

Discipline, Profession, and Growth of Project Management in an Organisation

753 words - 4 pages Projects have ‘being undertaken in a rudimentary form back beyond the Romans to early civilizations,’(Walker and Dart, 2011, p.4-16) from building the ‘Great Wall of China’, to ‘The Great Pyramid of Giza’ (Haughey, 2013) and notable architectural buildings that are still in existence today. Project management tools such as program evaluation review technique (PERT) and critical path method (CPM) came into effect between 1956 to 1958 (Azzopardi

Chapter 14 – Project Planning and Scheduling

1763 words - 8 pages three types of charting techniques / tools did the Project Managers and Schedulers use to plan, schedule, track and report on the project 1. Gantt Chart 2. Performance Evaluations and Review Techniques (PERT) 3. CPM 49. After a series of prolonged delays, the project management team decided to “crash” the schedule; what decision were they trying to reach? The decision the project management team was trying to reach was: when does the cost

Related Essays

Project Management Analysis

932 words - 4 pages is in any company, what really matters is how they will handle the little bumps in the road as they come while in the project. Apparently McCarthy is doing something right, because they have been in business for a long time, and every year they get better and better. References Mind Tools, (2012) Critical Path Analysis and PERT Charts. Retrieved from:  http://www.mindtools.com/critpath.html  McCarthy Building Companies, (2012) About McCarthy. Retrieved from http://www.mccarthy.com/about/ The Constructor, (2012). PERT, CPM, AND GANTT CHART. Retrieved from http://theconstructor.org/constrution/const-management/pert-cpm-and-gantt-chart/94/

Business Management Essay

2509 words - 11 pages | |412 |834,000 |129,111.12 | [pic][pic][pic] Part C: Without regard to parts A and B, please address the following 1) Please discuss briefly two distinct significant similarities and two distinct significant differences between PERT and CPM. Both PERT and CPM find and use the critical path of

Quantitative Analysis

1119 words - 5 pages PERT/CPM TECHNIQUES Introduction: This task requires candidates to prepare a program evaluation and review technique (PERT) chart and apply critical path method (CPM) techniques. Given: Company A is installing a Web-based customer-feedback system to meet customer needs for quick response when rolling out new products. A new product line is rolling out in 34 weeks and the customer-feedback system must be installed and running in time for

Mgt 301 Exam 2 Questions Essay

1434 words - 6 pages critical path can be determined by the use of either the forward pass or the backward path-false What is the shortest duration required to complete an activity-crash time The fundamental difference between pert and cpm is the pert uses the beta distribution for crashing projects while the cpm uses cost estimates-false Which of the following Is a limitation of pert and cpm-there is the inherent danger of placing too much emphasis of critical paths