Analysis Ceylon Electricity Board

1958 words - 8 pages

Executive Summary

The Objective of this report is to practice the analysis of possible scales and scopes of an engineering organization and to recommend and suggest ways to utilize them fully. The organization chosen for the analysis Ceylon Electricity Board (referred to as CEB hereafter), which is the Sri Lankan government organization for generation, transmission and distribution of electricity for local industrial and domestic consumption. Following a general introduction to the services by the organization and the structure of it and market competencies, the economies of scale and scope are discussed and finally a few suggestions are made to utilize them for the improvement of the ...view middle of the document...

The structure of CEB is highly dependent on the government and its decisions passed. Government intervention is at a higher degree that although the highest officials such as the Chief Executive Officer make suggestions on the management of power systems, they have to be approved by the government to be implemented. CEB is distributed throughout the whole island for better interaction with consumers and monitoring of field. The branches are divided into provincial and are offices.

The performance in planning and implementation of CEB still has chances to be improved. The electrification of total Sri Lanka population is only 55% and the rest (45% of population) are in darkness. It seems to be quite unsuccessful and unfair sometimes when considering rural off-grid villages. On other hand, the consumption of electricity presently requires a higher cost compared to the rest of the world, due to inefficiency in planning, management, performance, design of power systems and implementation. Also CEB suffers from losses in transmission and distribution.

2. The Local Electricity Demand and the Cost of Production

The demand for electricity as power source is for industrial and domestic purposes. Since Sri Lanka is not an industrialized country, the peak power demand occurs in between 7 p.m. to 10 p.m. That is, the electricity mainly used for lighting purpose in the domestic sector. Annual demand for the power energy in Sri Lanka approaches 7200 GWh. The demand is increasing 8% annually. The 55% of total population gain electricity. The others are not consuming due to poverty or difficulties in transmission power to remote areas. Electricity tariff is much higher compared to the other countries. However, people can’t buy the electricity from another organization. Monopoly market is there for the selling of electricity. In future, CEB has to implement power distribution to the whole island at a low price. As the demand is always increasing annually, the power distribution is not adequate. It is evident that the power distribution is not so reliable and power failures have often occurred in the recent past. Also since the main mean of generation of electricity is hydro-electric plants, the whole country needs to be depended on the weather for electricity. The electricity is required by the consumers at highly reliable service and a low cost.

The costs vary according to the usage of energy sources. Current energy sources utilized are: Hydro power, Thermal power and some other renewable sources such as Wind power, Solar power, Dendro power etc. And also there are generation, distribution, transmission and installation cost. All of these add up to the cost of production, which determines the electricity tariff.

Cost of generation:
Coal: SLR 4.00 - 4.50 /kWh
Combined cycle: SLR 3.00 - 4.25 /kWh
Auto Diesel power: SLR 8.00 - 10.00 /kWh
Emergency Diesel power: SLR 10.00 - 15.00 /kWh

There is a great government...

Other Papers Like Analysis Ceylon Electricity Board

Aarkstore - GridPoint, Inc. - Strategic SWOT Analysis Review

1209 words - 5 pages . - Business Description 14 GridPoint, Inc. - SWOT Analysis 15 SWOT Analysis - Overview 15 GridPoint, Inc. - Strengths 15 Strength - Comprehensive Smart Grid Platform 15 Strength - Awards and Recognition 15 GridPoint, Inc. - Weaknesses 16 Weakness - Limited Management Layers 16 GridPoint, Inc. - Opportunities 17 Opportunity - Increasing Electricity Demand in the US 17 Opportunity - Scope for Smarter Grids Technology 17 Opportunity

Case of the Proposed Jiminy Peak Wind Turbine

1605 words - 7 pages 1. Two commonly used methods of financial analysis are payback and present value. Payback determines the length of time for an investment to return its original cost (1). Using the assumptions stated below the payback of the Jiminy Nick wind turbine with a cost of about $3.3 million would return the investment in about four years time. Net present value summarizes the initial cost of an investment, the estimated annual cash flows, and expected

Growth and Performance of Security Market in Nepal

4057 words - 17 pages The Journal of Nepalese Business Studies Vol. I No. 1 Dec. 2004 Growth and Performance of Securities Market in Nepal Jas Bahadur Gurung* ABSTRACT Securities Board, Nepal, an apex regulator and facilitator of capital market, and Nepal Stock Exchange Ltd., only a single stock market, are the main constituents of securities market in Nepal. This paper attempts to study the growth trend and analyze the performance of Nepalese

Textile Industry of Pakistan

2564 words - 11 pages 2015 “Impact of Energy Crisis, Interest Rates and Inflation on Textile Sector of Pakistan” Term Report, Fall 2015 Submitted by: Zehra Hasan Zaidi, Sana Shamim,Hamza Nadeem, Abeer Salman Submitted by: Zehra Hasan Zaidi, Sana Shamim,Hamza Nadeem, Abeer Salman LETTER OF TRANSMITTAL 1st December 2015 The Course lecturer Analysis of Pakistani Industries Institute of Business Management Korangi Creek, Karachi. Dear Madam, SUBJECT: TERM

I Want to Do Research

5150 words - 21 pages (Previously Nepal Bank of Ceylon Limited) | 1996 | Bhairawa | Nccbank.com.np | 12 | Lumbini Bank Limited | 1998 | Narayangrah | www.lumbanibank.com | 13 | Nepal Industrial and Commercial Bank Limited | 1998 | Biratnagar | www.nicbank.com.np | 14 | Machhapuchre Bank Limited | 2000 | Phokara | Machbank.com | 15 | Kumari Bank Limited | 2001 | Kathmandu | www.kumaribank.com | 16 | Laxmi Bank Limited | 2002 | Birjung | www.laxmibank.com | 17

Financial Growth of Square Pharma

4217 words - 17 pages poisoning. • The achievement of Millennium Development goals for the Human Civilization. Management Apparatus BOARD OF DIRECTORS AUDIT COMMITTEE MANAGEMENT COMMITEE SENIOR CORPORATE OFFICIALS COMPANY SECRETARY AUDITORS LEGAL ADVISORS Mr. Rafique-ul Huq, Bar-at-Law Mr. Moniruzzaman Khan, Bar-at-Law Ms. Nihad Kabir, Bar-at-Law BANKERS Janata Bank Citibank Standard Chartered Bank Commercial Bank of Ceylon Ltd

Communication Theory Analysis: Functional Group Theory

1786 words - 8 pages “A Communication Event Analysis: Functional Group Theory within a Fundraising Committee” Sometimes problem-solving can be more successfully executed when there is more than one brain working towards a solution. By working within a group, one can also have the ability to see possible perils that personal biases could have otherwise delayed. The Functional Group Communications Theory can mainly be correlated to researchers, Dennis

Financial Statement Presentation

1223 words - 5 pages To: FASB / IASB From: Billy Leigh Re: Proposed Changes to Financial Statement Presentation Dear Members of IASB / FASB, As I understand it, the Financial Accounting Standards Board (FASB) and International Accounting Standards Board (IASB) are proposing a joint venture to change the presentation of financial statements. I appreciate the opportunity to comment on the proposed changes. It is in my humble opinion that the

Building a New Structure

735 words - 3 pages imaging systems, factory automation and control systems, and lighting systems. Total shipments in the US alone is $100 billion annually. NEMA also provides forums for the development of technical standards that are in the best interests of the industry and users and collection, analysis, and dissemination of industry data. NEMA is a pacesetting champion for interoperability, safety, environment, and market enhancement through advocacy, standards for

Prime Bank Limited

4793 words - 20 pages ), which is the only private sector hospital of this kind in Bangladesh. He is a Member of the Board of Governors of People’s University of Bangladesh. Mr. Islam has been providing financial assistance to the brilliant students of Viquarunnessa Noon School & College (a leading girl school and college of the country) by awarding gold medal every year. He is also the life member of Sandhani (a voluntary organization). He was awarded Kazi Jasimuddin

Control Activities

1569 words - 7 pages contribute to the mitigation of risks to the achievement of objectives to acceptable levels. Risks regarding electricity * Increase in tariffs * Power cuts or load shedding * Consumers (community) ‘s loss of confidence in the municipality * Inability to maintain networks or power stations and keep in time with technological improvements * Installation of solar systems can also be a risk as this would affect the sales of

Related Essays

Additionality Assessment Essay

2574 words - 11 pages Year-wise analysis of additionality Year 2006: In the year 2006 a total of 19 wind energy projects were registered out of which 14 were small scale projects. Small scale projects: Additionality of 3 small scale projects has been studied as a sample. These projects are: 1. Generation of electricity from 6.25 MW capacity wind mills by Sun-n-Sand Hotels Pvt. Ltd at Soda Mada Rajasthan 2. 3.75 MW Small Scale Grid Connected “Demonstration

Strategic Essay

2787 words - 12 pages 1. Introduction to the Organization The banking sector remains always the most dominant sector of the financial sector. Hatton National Bank PLC (HNB) is Sri Lanka’s second largest private sector bank in terms of assets (behind Commercial Bank of Ceylon) and is the fourth largest amongst all banks (after accounting for the two state banks, Bank of Ceylon and Peoples’ Bank). HNB accounts for 10% of banking system assets. HNB provides a

Luotang Power Case Study

3244 words - 13 pages Board of Directors of Luotang’s parent company, that is HT Power about the results received in the 2011 Report of Operations. He is concerned about what their reaction will be as the results are disappointing, although the company did perform well for the year. Tan wants to impress the parent company because HT Power is considering a 2,000 MW expansion at Luotang. Other than that, Tan wants to be promoted to the company’s Executive Vice President

Energy Crises In Pakistan Essay

3117 words - 13 pages Turbine Power Station, 244 MW Faisalabad Gas Power Station, Multan 195 MW Gas Turbine Kotri Gas Turbine Panjgur Gas Turbine Korangi Gas Turbine SITE Installed Capacity 137 MW 300 MW 300 MW 50 MW Source: PPIB, Ministry of Water & Power, Alternate Energy development board Due to rising demand, power infrastructure issues, and poor governance severe electricity shortages have ensued …   ROOTS OF PAKISTAN’S